Nov 09: Side blind measured up 143_Blind_211109.jpg 2009-11-21 13:53:39 |
Nov 09: 143 now with windows and staircases 143_Glazed_211109.jpg 2009-11-21 12:17:23 |
July 09: 143 now with roof fitted. Glazing next. 143_200709_Paul_Turner.JPG 2009-07-20 13:25:00 |
Apr 09: 143's lower saloon panelling now complete Standard_143_250409.JPG 2009-04-25 09:00:00 |
Mar 09: The seat boxes have now been fitted into the lower deck. 143_p18.jpg 2009-03-27 00:00:00 |
Feb 09: First stair case, roughly in place Image037.jpg 2009-02-17 20:40:25 |
Feb 09: Salloon floor in place. 143_06_Feb_09_JM__1_.jpg 2009-02-01 12:28:00 |
Feb 09: Platform Flooring 143_06_Feb_09_JM__4_.jpg 2009-02-01 12:16:59 |
Nov 08: Canopy fitted, floor in progress 143_Canopy_LTT_Depot_151108.JPG 2008-11-15 13:43:00 |
Sept 08 - platforms making progress - flooring materials now arrived Standard_143_140908.JPG 2008-09-14 10:47:49 |
July 08: Much of 143's interior woodwork has been fitted. Completed roof sticks are also visible 143_Interior_150708_PT3.JPG 2008-07-15 20:05:31 |
July 08: 143 was moved within the LTT Depot to more spacious working area to allow refitting of the platforms 143_On_Move_150708_PT.JPG 2008-07-15 19:47:58 |
New roof sticks have been fitted, alternate ones sit in metal channels, some of which have been renewed, others reused 143_Roofsticks_101107.jpg 2007-11-10 13:04:44 |
New canopy framework has been constructed by Festiniog Railway and has now returned 143_Canopy_101107.jpg 2007-11-10 13:03:09 |
143's underframe left for repair work at Bower's derbyshire on 14 Feb 143_underframe_140207_MP.jpg.jpg 2007-02-15 12:04:12 |
Jan 07 - underframe now separated from trucks and awaiting repairs 143_Underframe_160107.jpg 2007-01-16 00:00:00 |
Sept 06 - lifting the body from the underframe 143_BodyLift_090906.jpg 2006-09-09 00:00:00 |
May 06: Lower deck is now extensively stripped - even the roof is back to its bare roof sticks 143_04.jpg 2006-05-13 13:00:00 |
143's top deck has now been removed for rebuild elsewhere. The lower deck sides have been stripped and the ends will follow shortly 143_01.jpg 2006-05-01 16:00:00 |
143's top deck was separated 82 years after the two halves were mated during construction. It is shortly to be taken away for rebuilding back to original format 143_TopDeckSplit_LTTDepot_190306.jpg 2006-03-19 00:00:00 |
Arrival at Brinwell Road 753_m2_arriving_Brinwell_Rd_13-04-03.jpg 2004-02-28 16:52:31 |
Loading in Blundell Street 753_m1_loading__Blundell_St_13-04-03.jpg 2004-02-28 16:49:23 |
Awaiting the move to LTT Depot 753_d3_stripped_in_depot.jpg 2004-02-28 16:43:40 |
Stored in the depot where it languished from 1990-2003 753_d2_stored_in_depot.jpg 2004-02-28 16:41:34 |
| | | |